1. Pre-embed iron or wooden bricks (except water bricks) in the structural layer. The burial position should be accurate and there should be enough room for adjustment. 2. Transition connecting pieces are set on iron pieces and wooden bricks to adjust the error of the pieces, and can be nailed, welded and screwed through with …